LIVE-WORK-STEERING — Choose the next action while Work is changing
Preface node
heading:live-work-steering-choose-the-next-action-while-work-is-changing:452
What this page is
This is generated FPF reference text from the specification preface or supporting sections. It helps interpret FPF; it is not FPF Reference product documentation.
Methodology
Use it to understand how the specification wants to be read, then return to a route, pattern, or work packet for active work. Cite generated IDs only when the wording changes the task decision.
Content
- Situation: Ongoing Work has an applicable domain Method, but a current fact can change what should happen next.
- Question: What should the deciding System choose now, who will perform it, and when must they stop or look again?
- First useful result or honest blocker: One bounded decision, intended performer, and feedback condition—or a named blocker due to missing or outdated action-guiding information, authority, capability, safety, applicability, or no current Work.
- Start with:
A.15.7. - Stop or return: Stop when the action, performer, and nearest return condition are clear. If ongoing Work is blocked by a missing or unsupported performer, support, or continuation-state relation rather than by candidate choice, use
A.15.8to repair that configuration or stop, then return. If Work has not begun, useA.15.2for intended-work content,A.15.5for work-entry readiness, orC.11only when a known chooser must compare an already formedOptionSet.
Last Updated: 2026-09-03 — upstream FPF commit b999972c (github.com/ailev/FPF)