LIVE-WORK-STEERING — Choose the next action while Work is changing

Preface node heading:live-work-steering-choose-the-next-action-while-work-is-changing:452

What this page is

This is generated FPF reference text from the specification preface or supporting sections. It helps interpret FPF; it is not FPF Reference product documentation.

Methodology

Use it to understand how the specification wants to be read, then return to a route, pattern, or work packet for active work. Cite generated IDs only when the wording changes the task decision.

Content

  • Situation: Ongoing Work has an applicable domain Method, but a current fact can change what should happen next.
  • Question: What should the deciding System choose now, who will perform it, and when must they stop or look again?
  • First useful result or honest blocker: One bounded decision, intended performer, and feedback condition—or a named blocker due to missing or outdated action-guiding information, authority, capability, safety, applicability, or no current Work.
  • Start with: A.15.7.
  • Stop or return: Stop when the action, performer, and nearest return condition are clear. If ongoing Work is blocked by a missing or unsupported performer, support, or continuation-state relation rather than by candidate choice, use A.15.8 to repair that configuration or stop, then return. If Work has not begun, use A.15.2 for intended-work content, A.15.5 for work-entry readiness, or C.11 only when a known chooser must compare an already formed OptionSet.

Last Updated: 2026-09-03 — upstream FPF commit b999972c (github.com/ailev/FPF)