FPF.Reference:16.7.2 - Several structures and several views can coexist

Preface node heading:fpf-reference-16-7-2-several-structures-and-several-views-can-coexist:1683

What this page is

This is generated FPF reference text from the specification preface or supporting sections. It helps interpret FPF; it is not FPF Reference product documentation.

Methodology

Use it to understand how the specification wants to be read, then return to a route, pattern, or work packet for active work. Cite generated IDs only when the wording changes the task decision.

Content

A Method decision may depend on a Method composition structure, a Method unfolding, simultaneous Work, an allocation structure, a subject-and-support arrangement, a description structure, or cultural relations. These structures need not be isomorphic. Name the structure and relation that changes the decision.

Project, process, and case views can expose different claims about the same Work. A project viewpoint may expose dates, allocations, authorities, and decision slots. A process viewpoint may expose recurring input/result and coordination correspondences. A case viewpoint may expose the changing evidence, exception, and next decision.


Last Updated: 2026-11-22 — upstream FPF commit 7a93d8f8 (github.com/ailev/FPF)