A.15.3:4.3 Relation to Work enactment (planned baseline vs actuals)
Preface node
heading:a-15-3-4-3-relation-to-work-enactment-planned-baseline-vs-actuals:20877
What this page is
This is generated FPF reference text from the specification preface or supporting sections. It helps interpret FPF; it is not FPF Reference product documentation.
Methodology
Use it to understand how the specification wants to be read, then return to a route, pattern, or work packet for active work. Cite generated IDs only when the wording changes the task decision.
Content
-
A
SlotFillingsPlanItemis not a witness ofFinalizeLaunchValues. Launch values (actuals) occur only in Work enactment, and their witness belongs in Work and audit surfaces, not in this PlanItem. -
Deviation at execution time is allowed, but it must be recorded as variance in Work, and the plan must not be rewritten to match the execution. When a Work enactment claims to follow a planned baseline, the Work MUST cite the
SlotFillingsPlanItemin its Audit as the planned baseline reference, and MUST record any variance against it (rather than “backfilling” the plan). The baseline citation SHOULD be edition-addressable (i.e., the Work cites a stable PlanItem edition), so that subsequent PlanItem revisions cannot erase what was actually planned. If the baseline needs to change (including any edition-pinned ref changes), create a new PlanItem edition (or a new PlanItem) and treat the difference as a planning change—not as a retroactive edit of the previously cited baseline.